Palm Oil Plant Expansion


Valdes was engaged to study the facility requirements necessary to increase production at a Palm Oil plant by 380,000,000 lbs per year over the current capacity and to implement Enzymatic Interesterification on this $34 million TIC project. All work was planned on an aggressive schedule and prepared with an FEL3 package which included a detailed estimate and back-up documentation.

Valdes completed a constructability study related to the construction of two key facility components and prepared preliminary equipment layouts and line studies for all major facilities and locations. Following this work, preliminary designs were prepared for structural steel, foundations, and electrical and control requirements. Valdes solicited two proposals for all trades and for fabricated steel.