Facilities

Design Solutions for Renovations & New Buildings

Valdes’ team of architects and engineers are focused on meeting our client’s facilities needs to help them achieve their mission and/or grow their businesses. Valdes staff generate our designs with the knowledge that funding, and schedules are ever-changing and with the goal to be flexible and responsive to the unique drivers of each facility project.

FACILITIES PROJECT EXPERIENCE

• New Buildings

• Building Condition Assessments

• Adaptive Reuse/Renovations

• Standard & High Hazard Building Code Review/Analysis

• Building/Site Master Planning

• Clean Rooms

• Laboratories

• Workspace

• Utility Infrastructure (Power Plant & Utility Distribution)

• Research & Development

• Specialized HVAC & Controls

• LEED Certified Facilities

Case Study

Lab Sterilization Room

Lab Sterilization Room

A large national manufacturer of sterilized equipment needed to relocate five Ethylene Oxide sterilizers from another location and accommodate them at their already existing facility. The client needed to maintain the building at a constant room temperature and ventilation and take into account adding more sterilizers and a dry reactor system in the future.

View More
New Production Plant

New Production Plant

A U.S.-based luxury home furnishings manufacturer needed to accommodate the growing demand for their products. Their production facility in Vietnam was no longer able to keep up with the growth and they wanted to design a larger facility in the same general area as their current facility.

View More
Fire Station

Fire Station

A large refinery was preparing to add a new fire station, but needed to first understand both current and future operations and space needs within the context of existing conditions. They also needed a long-term plan to serve the refinery's needs in terms of safety and fire department response time.

View More
Abbott Power Plant - University of Illinois

Abbott Power Plant - University of Illinois

After installation of new feedwater pumps and piping at University of Illinois Urbana-Champaign's (UIUC) Abbott Power Plant, UIUC noticed significant vibration problems and pump operating issues. Additionally, no drawings or design details had been provided for the installation and, therefore, staff was uncertain about where to start identifying the source of the problem.

View More
Site Master Plan

Site Master Plan

Over the past 10 years, our pharmaceutical client has significantly grown such that its current facilities are stretched to their limits and a significant expansion/site reorganization is necessary to support current operations and projected growth. Our client engaged Valdes to generate a three-to-five-year site master plan that thoughtfully considers the growth of its current site.

View More
Topographic Survey

Topographic Survey

A large global private client needed to keep up with increasing product demand at one of their facilities by adding on to existing buildings. However, the existing facility was congested and contained multiple underground utilities. These utilities and other existing conditions needed to be carefully understood and considered when planning for the new construction.

View More
Heating Plant Design Build

Heating Plant Design Build

A public sector higher education client needed to renovate and add on to their already existing heating plant to provide a reliable, economical, and sustainable central heating facility for its campus. The client also needed the new construction to be delivered using the design-build method.

View More
Air Handling Unit Replacement

Air Handling Unit Replacement

A public sector higher education client in the Illinois Capital Development Board portfolio had various air handling units (AHUs) that were original to the building and beyond their anticipated service life. The client needed to replace these units because they were experiencing operational issues and were no longer reliable. Additionally, they were noisy, suffered from capacity reductions, and, in some cases, used double the amount of outside air than permitted by current code requirements.

View More
Public Works Facility Optimization

Public Works Facility Optimization

A municipal client had an existing public works facility in great need of updates and reorganization. After experiencing 35+ years of various additions and renovations, they needed a comprehensive plan to accommodate for growth over the next 30 years, better utilize their existing facilities, update physical spaces to accommodate current practices, and incorporate additional acquired land.

View More
Laboratory Programming/Conceptual Design

Laboratory Programming/Conceptual Design

A client operates a bulk fine chemical and active pharmaceutical ingredient (API) contract manufacturing facility. They had an immediate need to expand their Quality Control (QC), Analytical Development (AD), and Chemical Development (CD) laboratory facilities within the existing building area with minimal or no interruption to laboratory services.

View More
Village Hall AHU Replacement

Village Hall AHU Replacement

A municipal client's village hall had been served by five Carrier roof top units (RTUs) since the building was built in 2003. These RTUs provided heating, cooling, and air conditioning to each floor of the village hall. However, because of a roof design that caused the area to reach very hot temperatures, the RTUs would overheat in the cooling season causing premature HVAC failures and they needed to be replaced.

View More
HPAPI Laboratory

HPAPI Laboratory

A client that provides contract research and development and clinical supplies services was interested for the first time in incorporating highly potent active pharmaceutical ingredient (HPAPI) capabilities to their offering of services. They wanted to take a three-phase approach to gradually introduce HPAPI production capabilities to their facility by repurposing existing space.

View More
Small Molecule Facility

Small Molecule Facility

A contract development and manufacturing organization (CDMO) client was planning to upgrade their site to allow for the contract manufacturing of bulk small molecule Schedule 2 active pharmaceutical ingredients (API). They had a couple of ideas of how to incorporate this upgrade into their current facility, but needed evidence to support which option would be the fastest path to market, minimize interruptions to existing operations and offer a long-term upgrade to existing infrastructure.

View More
Generator Replacement

Generator Replacement

A municipal client needed to guarantee power to their village hall in the event of a utility power failure. Their current generator only supported portions of their village hall with emergency power and they needed a new unit designed to provide emergency power to the entire building.

View More
Boundary and Control Survey

Boundary and Control Survey

An industrial client desired a unique plant grid/coordinate system for design and construction reference. In addition, the boundary line limits of the plant were unknown and needed to be established for future planning and expansion.

View More
HVAC and Roof Replacement

HVAC and Roof Replacement

A public sector correctional facility client in the Illinois Capital Development Board portfolio had been experiencing various issues with its heating and cooling systems that were affecting the temperature regulation of both housing and communal spaces. Various systems, including the air handling units (AHUs), chillers, cooling towers, and boiler were past their anticipated service life and experiencing maintenance issues. The facility needed these issues addressed immediately considering they were housing people around the clock.

View More
3D Laser Scanning with Survey Control

3D Laser Scanning with Survey Control

An airline needed to make structural improvements to an underground tunnel in order to support the load of larger aircraft on the taxiway above. To match existing information, the scan data needed to be positioned on state plane coordinates.

View More

Full Service Project Delivery Process

Facilities

DESIGN PHASES

Programming/Conceptual Design

Schematic/Design Development

Bidding/Permit Documents

Construction Documents

BIDDING SUPPORT

Contractor RFIs

Bid Evaluation/

Recommendations

CONSTRUCTION ADMINISTRATION

Shop Drawing Review

RFIs

Construction Observation

Pay Application Review

PROJECT CLOSE-OUT

Punch list

O&M Manuals

Record Documents

VIEW OUR MARKETS