Case Study
SALF Leachate Project
Challenge:
A power plant client needed to redirect ash contact water from an on-site landfill to wet scrubbers for pollution mitigation to comply with a consent degree. The client was faced with a challenge of improving existing conditions to comply with the environmental requirements agreed upon with their state government.
Solution:
Valdes assumed responsibility for the detail engineering and filled in numerous gaps from the initial project study phase. This allowed our utility client to save significantly on material and installation costs during the execution phase of this project.
Valdes ultimately engineered and designed all associated systems to redirect ash contact water from an on-site landfill to wet scrubbers for pollution mitigation, per the consent decree with the State of Indiana. Valdes repurposed the existing storm water pond to handle the hazardous material - utilizing a new pond design, addition of pond liner, new electrical and controls systems, and new forwarding pumps. The wastewater is to be processed at the power plant and disposed of via the plant’s wet scrubbers.
Valdes also performed the layout and routing of approximately 15,000 feet of mostly underground 12” HDPE pipe on plant property to convey the ash leachate contact water to the main plant for disposal. Additionally, Valdes designed and routed two underground 14kV power distribution lines and fiber optic lines, along with separate concrete duct banks, to provide power to the new electrical building (following the same routing as the transfer piping).
Valdes provided significant cost savings to the client by reusing an existing storm water pond to hold ash leachate. Valdes designed a new impermeable liner, and it was installed to prevent contaminated water from reaching the ground water supply. Valdes designed this pond to handle back-to-back 25-year rain events and is designed with redundant HDPE liners.
Impact:
Valdes provided a significant cost savings to the client by reusing an existing storm water pond to hold ash leachate. It was designed to handle back-to-back, 25-year rain events and with redundant HPDE liners. A new impermeable liner was designed and installed to prevent contaminated water from reaching the ground water supply.
SERVICES:
Piping & Plant Layout
- Piping Layouts
- General Arrangement Drawings
- Line Studies
- Piping Isometrics
- Equipment Arrangements
- Vessel Nozzle Orientation
- Vessel Platform & Ladder Layout
- Underground Piping Layout
- Process & Utility Piping Design
- Construction Field Support
- High Definition Laser Scanning & 3D Modeling/Design
Mechanical
- Facility Design & Plant Layout
- Equipment Selection
- Material Handling & Dust Control Systems
- Rotating Equipment Sizing & Specification
- HVAC
- Fire Protection & Detection
- Plumbing
- Fluid Heat Tracing
- Blending & Mixing Systems
- Heat Exchanger Selection
- Plant Utilities
- Industrial/Hygiene Ventilation
- Equipment & Piping Specifications
- Field Walkdowns/Constructability Review
- Pressure Vessel Design
Pipe Stress Analysis
- High-Energy Piping Surveillance
- Design/Sketch Drawings
- ASME Code Calculation
- Nozzle Finite Element Analysis
- Vessel/Heat Exchanger Design
- Vessel/Heat Exchanger Modifications & Alterations
- Vessel/Heat Exchanger Re-Rating Package
- Inspections
- Piping Engineering
- Pipe Hangers/Supports
- Pipe Loading Conditions on Equipment
- Surveillance Report
Civil
- Site Development/Selection
- Storm/Sanitary/Oily Water Sewers
- Stormwater Management/Permitting
- Grading/Drainage
- Containment Design
- Roadway & Pavement Design
- Underground Utilities
- Railroad Layout
Structural
- Retaining Structures
- Building Frame Design
- Seismic Analysis
- Foundation Design
- Steel Structure Design
- Vibration Analysis
- Concrete & Steel Restoration
- Inspection/Assessment/Reinforcement of Existing Structures
- Structural Engineering Certification (SE)
Laser Scanning & Surveying
- Pre-Design Surveys
- Utility Mapping
- Structural Steel Surveys
- Topographic Maps
- Line & Grade Measurements
- Foundation Surveys
- As-Built Drawing Development
- Vessel & Equipment Surveys
- Spool Verification
Electrical
- System Analysis (SKM Power* Tools):
- Load Flow
- Short Circuit
- Overcurrent Coordination
- Arc Flash
- Transient Stability
- Utility/Industrial & Transmission/Service Substations
- Industrial Power Distribution:
- Power Transformers
- Low/Medium Voltage Switchgear
- Motor Control Centers
- VFD Installations
- Protective Relay Settings, Generators & Distribution
- Diesel Generator and UPS Systems
- DC systems
- Grounding & Lightning Protection
- Lighting
- Equipment & Raceway Layout Drawings
- Wiring Diagrams & Schematics
- Electrical Heat Tracing
- Area Classification & Code Compliance
Instrumentation & Controls
- PID Controller Application & Specification
- Instrument Selection & Specification
- Instrument Index & I/O Lists
- Control Valve Sizing & Specification
- Instrument Loop & Interconnection Diagrams
- Smart Plant Instrumentation/INtools
- HAZOP Participation
- Control Panel Design Instrument Location Plans
- Installation Details
- Instrument Commissioning
- Safety Instrumented Systems (SIS) Implementation*
- Engineering & Design in Accordance with ISA84 & IEC-61511 Standards
- HMI, MMI, & SCADA Functional Specifications
- Operator Interface Specifications
- Operator Usability Studies
- PLC & DCS
- Specification Selection
- Functional Descriptions
- Ladder Logic
- Hardware Interface
- System Architecture Drawings
- HART & Foundation Fieldbus
- Control Room Layout & Design
- Control System Training Manual
- Site/Factory Acceptance Testing