Challenge
A large refinery needed various equipment replaced sooner than expected due to corrosion. For each of the replacement projects, there was an increasing risk of reaching end of asset life-cycle prior to the planned replacement scheduled. The replacements were originally contemplated for a future turnaround, however, it was apparent that the work needed to execute the replacements would need to be ready for an upcoming turnaround schedule.
Solution
Valdes responded to this challenge and helped the client prepare project scope for pre-turnaround or turnaround implementation and expedited procurement and replacement of various replacement projects, including a hydrotreater separator drum ($5.4 MM), gas centrifix replacement ($1.5 MM), debutanizer tower ($10 MM), and heat exchangers ($5 MM).
Impact
Valdes accomplished the design objectives and delivered timely equipment procurement support and TAR contractor work scopes for the various replacement projects so that the client met the deadlines required of the upcoming TAR schedule.
Services
Civil
Structural
Mechanical
Electrical
Process
Instrumentation & Controls
Piping & Plant Layout
Laser Scanning & Surveying
Project Management
Project Controls
Plant Services & Support